Improving the efficiency of capital repairs of linear construction facilities, taking into account uncertainty and risk

Abstract

Improving the efficiency of capital repairs of linear construction facilities, taking into account uncertainty and risk

Sheina S.G., Tsopa N.V.

Incoming article date: 12.01.2026

The article is devoted to the study of linear capital construction objects - engineering structures with a significant length and small width (using the example of water pipelines), which have an independent real estate status. The relevance of increasing the efficiency of their overhaul, taking into account uncertainty and risks, is justified. The paper systematized the classification of artificially created inland waterways, identified key factors of repair efficiency, analyzed risks and methods for their minimization. Practical testing of the proposed solutions was carried out on the example of emergency sections of the Evpatoria water pipeline.

Keywords: capital construction object, linear object, efficiency, overhaul, uncertainty, risk, classification of linear objects, methods of overcoming obstacles, schedule of overhaul works, structure of overhaul costs